Hydraulic Fluid Power Motion and Control DJW Consulting Limited, UK Design & Project Management Consultants
Spacer  Arrow Image  home  Arrow Image  news  Arrow Image  services  Arrow Image  tech briefings  Arrow Image  application file  Arrow Image  about us  Arrow Image  contact

Tech Briefing - Number One

Application Lifting Bridge
Location Lowlands of Scotland
Environment Close proximity to Fresh water
Component Cylinder Control Manifold

The original installation of the equipment was dated to 2001, the date of inspection mid 2005.

The original requirement of life time operational was 30 years.

It has for some time been considered that nickel plating of steel manifold blocks in this type of environment was suitable & sufficient to prevent corrosion of the surfaces.

It is evident from this image that exposure to the environment combined with road salts, further considerations of protective finishes are required.

Tech Briefing One - Image

Considerations are recommended with respect to material selection of fixings & components, in this particular application a steel manual lowering needle valve was provided, corrosion of the exposed thread, rendered the valve unusable in the event of an emergency, the exact purpose of it's existence.

Solution

Use of stainless steel bodied components where ever possible, stainless steel fixings, stainless steel pipe fittings & Denso Tape steel plated manifold assembly.
Wilkinson Eyre Swing BridgeSandbanks
Footer Arrow Image   telephone 01793 886677   Arrow Image   fax 01793 886677  Arrow Image   email info@djwconsulting.co.uk